Episode notes

7.12 Test Disaster Recovery Plans

  • 7.12.1 Read-through/Checklist
  • 7.12.2 Walk-through/Tabletop
  • 7.12.3 Simulation
  • 7.12.4 Parallel
  • 7.12.5 Full Interruption
  • 7.12.6 Communications (e.g., stakeholders, test status, regulators)