The spring has been a bad season for nuclear power plants.
On one cool March Day, both reactors operated at full power, delivering 2200 megawatts of electricity to the community.
In the bowels of the plant, there’s an electrical cable room that spreads the essential cables for the two reactors. It’s the electrical lifeblood for controlling two reactors. It separates the non-safety side of the building from the safety side, where all the emergency equipment is housed. Just below the plant's control room, two construction workers were trying to seal air leaks between the buildings. There must not be airflow between the two buildings, or potentially radioactive substances could leak from the reactor building to the environment.
They used foam rubber to seal the leaks. They also used candles to determine whether the leaks in the ...