Note sull'episodio
In episode 17, Tabatha L discusses common reasons corner-grounded delta systems (Grounded B Phase) fail electrical inspection.
Parole chiave
electricianelectrical codeNECsafetyst louissafety firstelectricalfire hazardinspectionfailed inspectioncorner groundeddelta systemscorner grounded delta systemgrounded B