With Engr Ali Bukar Ahmad of Tran...
With Engr Ali Bukar Ahmad of Transmission Company of Nigeria (TCN) on 'Nuclear Power and West Africa Electricity Grid'

AfriNuke Podcast por Afrinuke Podcast

Notas del episodio

  • Nigeria’s grid can take 8100MW with with about 2000MW stranded energy
  • There are regulations to decentralize our transmission
  • The new power sector reform 2023 version touches a broad spectrum of energy solutions
  • The west African power pool connects 14 of the 15 west African countries ensuring electricity flow among these countries and beyond
  • Check the energy density of nuclear compared to other sources
  • The nuclear generation companies can start with independent transmission first
  • See illustration of Nuclear Fuel: https://mbazorjc.github.io/IMAGE/fuel1.png
  • Call for Mentorship: http ... 
Leer más
Palabras clave
TransmissionGrid capabilitywest african power poolSMR